Mauritania 4×300 tons cement silo project
This project is to expand the storage capacity and loading capacity of the owner’s existing cement silo. It requires building four 300-ton special cement steel silos based on the owner’s original two 3,000-ton concrete silos, and connecting the new silos with the original silo system to achieve the function of integrated control.

Project advantages
Efficient operation: optimize the design of the feeding and discharging system to ensure smooth and efficient material transportation.
Rationalization transformation: optimize the original equipment to improve the overall process adaptability.
Innovative design: adopt a multi-stage material conveying system to reduce the impact of drop and reduce wear. Safe and reliable: reduce material impact, improve equipment durability, and ensure safe operation.
Economic optimization: optimize costs while ensuring performance and improve project economy.

Equipment Configuration
4 small 300tons prefabricated steel silos and associated conveying process equipment, EP.
